Gambegre Site Suitability (0)
| Good Recharge Stucture (Percolation Tank, WHS, CCT, etc) |
| High Runoff Zone (Trenching, Stone Bunding) |
| Moderate Recharge Structure (WAT, GP, LBCD, etc) |
| No Suitable Intervention |
| Regeneration (Plantation, Vegetation Intervention, Grass Seeding, Stone Bunding, Bench Terracing, Trenching, etc) |
| Surface Water Harvesting Structure (WHS, FP, FB, etc |
|